Stud Threadlocking / Thread Sealing Application Method A-103
This method pertains to the application of SAF-T-LOK products for threadlocking and/or threadsealing blind holes. The procedure is to be used when assembling threaded metal parts, using SAF-T-LOK threadlockers or thread sealing products.

PROCEDURE
- Solvent clean the parts of any contamination. Use primer if parts must go back in service promptly.
- Apply T70 stud threadlocking compound to the male threads. Apply to the threads of the blind hole where the assembled stud will rest.
- Assemble the stud to the required depth or torque.
- The assembled parts will be sealed within one hour. A full cure will occur within 24 hours (or 4 hours with Primer).
- After cure of the T70 stud application, continue the assembly by applying the T42 threadlocking compound to the male threads of the stud.
- Assemble the joints to the required torque. Do not over tighten.
- The assembled parts will be low pressure sealed within one hour. A full cure will occur within 24 hours (or 4 hours with Primer).